Hudson Valley Logistics Center – East Fishkill, NY
Size:
529,000 sq. ft.
Location:
East Fishkill, NY
System:
Mechanically Attached
Manufacturer:
Sika Sarnafil
Project Description
Hudson Valley Logistics Center (HVLC) is a 529,000 sq. ft. warehouse and distribution center located in East Fishkill NY. Within a 4 hour drive of NYC, Boston, Philadelphia, and Long Island, and a population of more than 46 million people, HVLC is a critical piece of modern infrastructure. Tri-State was carefully selected to handle the roofing and waterproofing of this building because of our history of upholding the highest standards of safety and craftmanship within the industry, and an unwavering commitment to our customers.
For this project, Tri-State furnished and installed two layers of mechanically attached Sika Sarnatherm 2.6” polyisocyanurate (ISO) insulation to achieve an R-value of 30, and mechanically attached Sika Sarnafil .060 white PVC membrane over our ISO. As this project was ongoing, RC Andersen entrusted Tri-State to install all of the necessary wood blocking around perimeter walls, thus allowing for the installation of a Kynar 500 edge-metal system. All of the work completed by Tri-State was done so to all specifications required by Factory Mutual and Sika to achieve FM Global 1-90 and Sika 20 year no dollar limit (NDL) warranties.